Most budget problems don’t occur during construction—they happen long before groundbreaking due to poor planning.
Essential Preconstruction Items:
- Architectural drawings
- Structural engineering
- Material selections
- Soils and geotechnical reports
- Site layout and surveys
- Budget modeling
- Value engineering
Benefits:
- Accurate pricing
- Reduced change orders
- Fewer delays
- Better material availability
- Improved coordination with trades